Tyngsborough Middle School

TYNGSBOROUGH, MA

Our team was selected to undertake a full feasibility study for the Tyngsborough Middle School including evaluating options and cost implications for addition, renovation and new construction alternatives. Built in 1967, the 80,667 square foot, 2-story building currently accommodates students grades 6-8.

Having been renovated but never expanded, concerns about the current building range from antiquated systems and aging FF&E to space limitations and impact on adoption of current instructional models. The existing school does not currently provide the infrastructure or spatial requirements for flexible, project-based learning or co-teaching methodologies.

Tyngsborough Middle School

After consideration of multiple design options, the Town selected to pursue a 2-story, 112,784 square foot new construction option to be built on the site of an existing softball field. The project was submitted and approved by the Massachusetts School Building Authority and approved by voters in May 2022.

Completion is anticipated for school year 2026-2027.