JCJ was retained to complete programming, planning and design of a new facility to serve Oceanside, California. The facility includes an outdoor 25m lap and swim instruction pool, and an interactive play pool with water slides that is surrounded by a patio and outdoor seating. The indoor facility features a large aerobic room, multi-purpose room with a wood sprung floor, a large circuit-weight and free weight room, community room, child watch room, staff offices and large shower and locker facilities. The project was delivered design-build on a fast-track timeline and was completed within budget and two weeks ahead of schedule.